Kitchen Extensions • Eastwood, Nottinghamshire
Kitchen Extensions in Eastwood
Eastwood is an area we work in regularly — roughly 8 miles from Nottingham — and kitchen extensions here follow the same pattern we see across Nottinghamshire: the house is worth investing in, but the layout was planned for a different way of living. Extending at the back or side of the house specifically to create a larger kitchen-dining space, with the structural opening, glazing, services and the kitchen itself designed together. We handle design, structural engineering, approvals and construction as one contract, so the decisions that carry cost risk are made before you commit to a price rather than discovered once work has started.
FAST RESPONSE · NO OBLIGATION
Start your project today
- Free Quotations
- Experienced Team
- Quality Workmanship
- Fully Insured
Kitchen Extensions in Eastwood: how we approach the work
Our kitchen extension service in Eastwood starts with a measured survey of your house rather than a generic quotation. Extending at the back or side of the house specifically to create a larger kitchen-dining space, with the structural opening, glazing, services and the kitchen itself designed together.
The technical crux on most Eastwood projects is the beam over the opening into the existing house, daylight to the deepest part of the plan, drainage under the footprint and services to an island. We resolve these on paper first — with a structural engineer where the work needs one — and price the job on what is actually there.
Planning in Eastwood: Many single-storey kitchen extensions fall within permitted development; boundary position, depth and height decide whether an application is needed. We check the constraints for your specific address, including any planning history, and tell you plainly which route applies before drawings are commissioned.
Why Eastwood homeowners use a local design and build team
We are a local design and build contractor, not a national lead-generation site. Eastwood is roughly 8 miles from Nottingham, which means the same team that surveys your house is the one that designs it, prices it and builds it.
Cost is driven by footprint, glazing and rooflights, structural opening width, kitchen specification and flooring across old and new. We do not publish a rate per square metre because it misleads more often than it helps; you receive an itemised, written fixed-price quotation after the survey so you can see what each element costs and what changes it.
We do not invent projects, reviews or statistics to fill a page. What we can promise is a written programme, weekly updates, building control certification handed over at the end, and a twelve-month defects period during which we return to put right anything that fails.
Planning permission in Eastwood: Broxtowe Borough Council
The local planning authority for Eastwood is Broxtowe Borough Council. Any application for your kitchen extension — householder planning permission, a lawful development certificate or prior approval — is submitted to Broxtowe and decided against its adopted local plan and national policy. The council's planning team can be reached on 0115 917 7777 or by email at pabc@broxtowe.gov.uk, and applications are made through its own planning pages or the national Planning Portal.
Many single-storey kitchen extensions fall within permitted development; boundary position, depth and height decide whether an application is needed.
Householder planning application: The standard route for extensions and alterations that fall outside permitted development. Submitted with location and block plans, existing and proposed elevations and floor plans, and a fee set nationally; the council consults neighbours and publishes the decision on its planning register.
Party walls sit outside the council process entirely. Not a council process at all: the Party Wall etc. Act 1996 is a private notice served on the neighbour when work affects a shared wall, cuts into it, or excavates near their foundations. It runs alongside planning and building control, and being told about it late is what usually delays a start on site.
Before anything is drawn we check your address for the things that change the route: whether permitted development rights have been removed by a condition or an Article 4 direction, whether the property is listed or in a conservation area, any earlier planning decisions on the site, and the position of boundaries and highways.
In practice the order is: constraints check → measured survey → design that fits the route we have identified → submission to Broxtowe where an application is needed. Where the work is permitted development we recommend applying for a lawful development certificate, because it is the document that proves the position to a future buyer's solicitor.
Building regulations and building control in Eastwood
Planning and building control are separate approvals. Even where your kitchen extension in Eastwood needs no planning application, the building regulations still apply, and the work has to be notified. For Eastwood that means Erewash Borough Council, which delivers building control on Broxtowe's behalf, or a registered building control approver of your choice. That team can be contacted at buildingcontrol@erewash.gov.uk. We make the submission and manage it for you.
Full plans application: Drawings and structural calculations are checked before work starts and approved in writing. It is the safer route on structural work — steel beams, removed walls, new foundations — because the technical position is settled on paper rather than argued on site.
The beam over the opening into the existing house, daylight to the deepest part of the plan, drainage under the footprint and services to an island. Those are the elements building control looks at, alongside insulation and airtightness, fire safety and escape, ventilation, drainage, glazing, and the safety of electrical and any gas work.
Inspections happen at set stages rather than all at the end — typically excavation and foundations before concrete, drainage before it is covered, the structural frame or beams once installed, insulation and damp proofing before they are hidden, and a final inspection on completion. We book these and meet the inspector on site so nothing is buried before it is signed off.
At the end you are handed the building control completion certificate, structural calculations, electrical certification, gas paperwork where relevant, and any planning or lawful development documents. Keep them together: this is the pack a buyer's solicitor asks for when you sell.
Council contacts for Eastwood
Broxtowe Borough Council is the planning authority. Building control is handled by Erewash Borough Council, which delivers building control on Broxtowe's behalf.
- Building control
Details as published by the council. Fees and processing times change, so check the council's own page for the current figures — or let us handle the submission for you.
The process, step by step
1. Site visit in Eastwood: we measure, look at the constraints — boundaries, drainage, structure, roof — and talk about what is not working in the house now.
2. Options and cost range: sketch options with an honest range, before detailed drawings.
3. Approvals: permitted development check, lawful development certificate or planning application as your address requires, plus building control submission.
4. Engineering and fixed price: structural calculations completed, then a written fixed-price quotation with a stage programme.
5. Build: roughly ten to sixteen weeks on site including the kitchen fit. Yes; the existing kitchen stays in use until the extension is weathertight and the new services are ready.
6. Completion: snagging closed out, building control completion certificate issued, defects period begins.
Types of kitchen extensions we take on in Eastwood
In Eastwood and the surrounding area we take on rear kitchen extensions, side-return kitchen extensions, wrap-around kitchen extensions, kitchen-diner-living extensions, extensions with utility and boot room and glazed and lantern-roof kitchens. Housing stock varies street by street across Nottinghamshire, so each project is designed for the actual house rather than adapted from a standard drawing.
Read the full Kitchen Extensions guide for design options, planning rules and what drives cost.
Areas we cover near Eastwood
From Eastwood we also cover Kimberley, Langley Mill and Brinsley, and the wider Nottinghamshire area within roughly twenty-five miles of Nottingham. If you are just outside Eastwood, tell us the postcode and we will confirm.
Talk to us about your Eastwood project
The useful next step is a conversation about your actual house. Call us or send a WhatsApp message and we will arrange a visit to Eastwood, look at the constraints properly, talk through the planning route for your address and follow up in writing with options and a realistic cost range.
Kitchen Extensions in Eastwood: questions homeowners ask
Do I need planning permission for a kitchen extension in Eastwood?
Many single-storey kitchen extensions fall within permitted development; boundary position, depth and height decide whether an application is needed. We check the planning history and constraints for your specific Eastwood address before advising, and prepare the application or lawful development certificate where one is needed.
Which council decides a planning application in Eastwood?
Broxtowe Borough Council is the local planning authority for Eastwood. We prepare the drawings and supporting information to the standard Broxtowe expects and submit the application on your behalf.
How long does a kitchen extension take in Eastwood?
On site, roughly ten to sixteen weeks on site including the kitchen fit. Design, engineering and approvals before that usually add several weeks to a few months depending on the route, which is why we start the approvals process early.
How much does a kitchen extension cost in Eastwood?
It depends on footprint, glazing and rooflights, structural opening width and the finish level. We do not quote from a rate per square metre; after a survey of your Eastwood property you receive an itemised fixed-price quotation.
Can I stay in the house during a kitchen extension?
Yes; the existing kitchen stays in use until the extension is weathertight and the new services are ready.
Do you handle building control for work in Eastwood?
Yes. We notify building control — Broxtowe or an approved inspector — provide structural calculations where required, meet the inspector at each stage and hand you the completion certificate at the end.
Which areas near Eastwood do you cover?
Kimberley, Langley Mill and Brinsley and the rest of Nottinghamshire within roughly twenty-five miles of Nottingham. We are based in West Bridgford.
Should the kitchen go in the new part or the old part?
It depends on daylight, drainage and where the garden connection should be. We sketch both before you decide, because the answer changes the structure and the services.
Can you build over a drain?
Often, with a build-over agreement from the water authority, or the run is diverted. We check the drainage layout during the survey.
How do trees and ground conditions affect the foundations?
Clay soils and nearby trees usually mean deeper foundations, and the depth is set by the ground conditions and root influence at your address rather than by a standard detail. The beam over the opening into the existing house, daylight to the deepest part of the plan, drainage under the footprint and services to an island. We establish this before the fixed price so the foundation depth is not an open-ended extra.
What insulation and energy standards will apply?
Current building regulations set the standards for insulation, airtightness, glazing, ventilation and heating for the work, and they are checked by building control rather than left to the builder. The specification we quote for a kitchen extension in Eastwood is written to meet them, and the detail is in your quotation rather than assumed.
Who prepares the drawings and structural calculations?
We do, as part of the same contract — measured survey, design drawings, planning submission where needed, and structural calculations from a chartered engineer where the work is structural. You are not left coordinating an architect, an engineer and a builder who have never spoken to each other.
How is access and parking handled on a Eastwood street?
We agree access, skip position, material storage and working hours with you before we start, and let immediate neighbours know. Where the street is narrow or parking is restricted we plan deliveries around it, and any permits required for a skip or scaffold on the highway are arranged in advance.
How do payments work?
Against a written stage programme tied to completed work — never a large sum up front for work that has not happened. Each stage is set out in the quotation before you sign, so you know what has to be finished before the next payment falls due.
What happens if the survey uncovers something unexpected?
We tell you straight away, in writing, with the options and what each one costs before anything is done. Most surprises in older Nottinghamshire housing stock — old wiring, unsupported walls, previous unapproved alterations, damp — are found because we look for them at survey stage rather than after the walls are open.
GET STARTED
Planning kitchen extensions in Eastwood?
Call or WhatsApp for a site visit. Written options and an honest cost range, no pressure.