Building a double storey extension in Selston typically requires planning approval from Ashfield District Council or compliance with strict Permitted Development rules. Indicative costs generally range from £1,600 to £2,300 per square metre. Construction takes approximately 12 to 18 weeks on site, with building regulations overseen by the Erewash and West Nottinghamshire building consultancy.
FAST RESPONSE · NO OBLIGATION
Start your project today
- Free Quotations
- Experienced Team
- Quality Workmanship
- Fully Insured
FAST RESPONSE · NO OBLIGATION
Start your project today
- Free Quotations
- Experienced Team
- Quality Workmanship
- Fully Insured
Double Storey Extensions in Selston: the short answer
Building a double storey extension in Selston typically requires planning approval from Ashfield District Council or compliance with strict Permitted Development rules. Indicative costs generally range from £1,600 to £2,300 per square metre. Construction takes approximately 12 to 18 weeks on site, with building regulations overseen by the Erewash and West Nottinghamshire building consultancy.
- Typical time on site
- About 12 to 18 weeks on site
- Planning permission
- Required if exceeding Permitted Development depth, height, or boundary limits
- Decided by
- Ashfield District Council
- Indicative cost
- Indicative: £1,600 to £2,300 per m² as a guide
Selston property: what makes the work different here
Selston is a well-established village situated roughly 11 miles northwest of Nottingham city centre, characterised by a varied mix of housing spanning early twentieth-century miners' cottages, post-war semi-detached family homes, and modern detached residential cul-de-sacs. Properties along Nottingham Road, Mansfield Road, and surrounding residential avenues often occupy generous plots, making them prime candidates for substantial double storey extensions. However, the village's historic industrial and colliery background means ground stability must be carefully checked during initial foundation design. Many 1930s to 1970s semi-detached and detached homes feature traditional red brickwork and hipped or gable-ended pitched roofs, which require thoughtful architectural detailing so that two-storey additions blend naturally with the original house. Rear gardens are frequently deep enough to accommodate large two-storey rear footprints without compromising outdoor amenity space, but boundary proximities and mutual overlooking across neighbouring plots require sensible window placements. Our extensive experience working with local housing stock across Selston allows us to design structurally robust, visually complementary extensions that respect the streetscape while providing substantial modern family living space.
What double storey extensions involves
Building a double storey extension is a comprehensive structural undertaking that starts deep underground. Following initial site setup, we excavate trenches to engineer-specified depths, install drainage diversions, and pour concrete strip or trench-fill foundations. Once the ground-level concrete slab and damp-proof membranes are certified, our bricklayers construct the cavity walls, incorporating rigid insulation and ties, matching the exterior brickwork of your existing Selston home. Heavy structural steels are hoisted into place to support upper-floor loads and open up the lower living areas. We then install structural floor joists, raise the first-floor external masonry, and build the roof structure using timber rafters or pre-fabricated trusses, finishing with matching tiles or slates. Once weathertight, our internal teams run first-fix plumbing, heating pipework, and electrical cabling before fitting high-performance insulation and drylining. The critical knock-through stages are carried out using heavy-duty props and lintels. Finally, plastering, second-fix carpentry, joinery, bathroom plumbing, and flooring are completed ahead of thorough site cleaning and final building control sign-off.
Do I need planning permission in Selston? (Ashfield District Council)
Navigating the planning process in Selston requires engaging with Ashfield District Council. While certain modest double storey rear extensions can be constructed under national Permitted Development rights, the conditions are exacting. Under Permitted Development, a two-storey rear addition must not extend more than three metres beyond the rear wall of the original dwelling, must sit at least seven metres from the rear boundary, and must match the roof pitch and exterior materials of the host building. Furthermore, upper-floor side-facing windows must be fitted with obscure glazing and non-opening mechanisms up to 1.7 metres from the internal floor level. If your project exceeds these dimensions, involves a side wraparound, or if your property is subject to an Article 4 Direction or conservation constraints, a full householder planning application is required. We take complete ownership of the planning journey: producing accurate existing and proposed architectural drawings, submitting the application via Ashfield's planning portal, monitoring progress through the standard eight-week statutory consultation period, and liaising directly with planning officers to secure a positive outcome.
Building regulations, inspections and paperwork
Every double storey extension constructed in Selston must adhere strictly to current Building Regulations to guarantee structural safety, fire separation, thermal efficiency, acoustic insulation, and adequate drainage. For domestic projects in Selston, building control services are administered by Erewash Borough Council through the joint Erewash and West Nottinghamshire building consultancy. This partnership oversees statutory inspections from start to finish. Our team submits the initial building notice or full plans application, complete with detailed construction drawings and structural engineering calculations. On site, our site manager coordinates mandatory inspection visits at critical project milestones: foundation trench excavation before concrete pours, damp proof course installation, first-floor structural timber and steel placement, roof construction, thermal insulation checks, and drainage pressure testing. Once our trades finish the internal fit-out and all electrical (Part P) and heating (Gas Safe) testing is certified, the building control officer conducts a final walk-through. They then issue a formal Completion Certificate. This document proves that your double storey extension is legally compliant, safe, and ready for future property transactions.
Council contacts for Selston
Ashfield District Council is the planning authority. Building control is handled by Erewash Borough Council, which runs building control for Ashfield through the Erewash and West Nottinghamshire building consultancy.
- Building control
Details as published by the council. Fees and processing times change, so check the council's own page for the current figures — or let us handle the submission for you.
How we work, stage by stage
Our design and build service is structured to give Selston homeowners a transparent, stress-free experience from the initial conversation through to final sign-off. We begin with a thorough on-site feasibility consultation, assessing your plot, boundary lines, existing load-bearing walls, and drainage routes. Our architectural designers then develop layout plans that maximise upstairs and downstairs space while aligning with local planning guidelines. Next, we manage the planning submission with Ashfield District Council or confirm Permitted Development parameters, alongside coordinating structural engineering calculations. Before breaking ground, you receive a detailed, fixed-scope schedule of works with phased payment stages tied to physical milestones. During construction, our dedicated site manager oversees daily operations, coordinating bricklayers, carpenters, roofers, plumbers, and electricians while scheduling all building control inspections. We keep you updated throughout each phase, maintain a clean and secure site, and resolve any unexpected structural issues without delay. Once the build is fully finished, decorated, and certified by building control, we carry out a comprehensive handover inspection with you.
- Step 1
Initial Site Feasibility Survey
We visit your Selston property to assess site levels, drainage runs, boundary lines, and structural layout before discussing your spatial goals and establishing an indicative budget.
- Step 2
Architectural Design & Calculations
Our design team produces architectural drawings and elevations, while our structural engineer prepares calculations for foundations, lintels, and steel beam knock-throughs.
- Step 3
Planning & Building Regulations Submission
We submit and manage your full householder planning application with Ashfield District Council or confirm statutory compliance under Permitted Development rules.
- Step 4
Groundwork & Substructure
Our groundwork team excavates footings, routes drainage, pours concrete foundations, and lays the insulated sub-floor slab ready for building control inspection.
- Step 5
Superstructure, Steels & Roof
Bricklayers build cavity walls with matching facing bricks, hoist structural steelwork, fit upper-floor joists, and construct the pitched roof structure to achieve weathertightness.
- Step 6
First Fix & Structural Openings
We complete first-fix electrical and plumbing runs, insert structural lintels for knock-throughs, install high-density insulation, and apply hardwall plaster across both floors.
- Step 7
Second Fix & Completion Sign-Off
Carpenters, electricians, and plumbers complete second-fix installations, fit sanitaryware and heating connections, and coordinate final building control sign-off for your Completion Certificate.
| Weeks 1-3: Groundwork & Foundations | Site clearance, trench excavation, underground drainage diversions, building control foundation inspection, and concrete pouring. |
|---|---|
| Weeks 4-7: Superstructure & Masonry | Cavity wall brickwork, thermal insulation installation, damp-proof membranes, structural steel placement, and first-floor joist installation. |
| Weeks 8-10: Roof & Weathertight Envelope | Roof carpentry, membrane, battening, tiling, fascia installation, and window/door fitting to make the extension completely weathertight. |
| Weeks 11-14: First Fix & Plastering | Internal stud walls, first-fix electrical wiring, plumbing pipework, ceiling boarding, and multi-finish plastering throughout. |
| Weeks 15-18: Knock-Through, Second Fix & Handover | Cutting structural openings into existing walls, fitting final steel supports, second-fix joinery, sanitaryware, heating testing, and final sign-off. |
What drives the cost in Selston
The cost of a double storey extension in Selston is dictated by several practical site and structural variables. Substructure requirements often represent the first major variable; depending on historic ground conditions and soil composition in this part of Nottinghamshire, standard trench foundations may need deepening or upgrading to an engineered design. The structural complexity of opening up existing external walls on both the ground and first floor also drives cost, as wider open-plan kitchen and dining spaces require substantial steel beams and calculated padstones. Further price drivers include roof complexity, specifically whether we are tying a new pitched roof into existing valley systems, gables, or hip ends. Upstairs layout changes—such as integrating master en-suites, dressing rooms, or family bathrooms—require dedicated soil vent pipe routes, hot water cylinder upgrades, or new central heating loops. Finally, the choice of external finishes, such as sourcing bricks that accurately match older Nottinghamshire red-clay profiles, alongside specification choices for high-performance glazing, rooflights, and internal fittings, will determine where your project falls within our indicative range.
| Foundation Depth & Soil Conditions | Ground condition anomalies or ex-mining ground in Selston can require deeper trench footings or engineered raft foundations. |
|---|---|
| Structural Knock-Through Openings | Large open-plan ground floor layouts demand substantial structural steel beams, padstones, and specialised lifting equipment on site. |
| Roof Design & Complexity | Matching complex existing roof pitches, hipped profiles, and tile finishes increases material and carpentry labour costs. |
| Plumbing & Bathroom Additions | Adding master en-suites, family bathrooms, or downstairs cloakrooms requires extended soil stacks, pipework, and boiler capacity upgrades. |
| Glazing & Fenestration Choices | High-specification aluminium bi-fold doors, large roof lanterns, and premium external glazing raise overall envelope costs. |
| Internal Finishes & Specification | High-grade internal flooring, bespoke joinery, and tailored electrical layouts directly influence total project expenditure. |
Cost ranges on this page are indicative guides only, not quotations. Your figure depends on the survey, specification and site conditions.
Projects we take on in Selston
In Selston, our double storey extension projects cater to diverse family requirements and property styles. Common configurations include two-storey rear additions that combine an open-plan kitchen, dining, and garden living room on the ground floor with an expansive master bedroom suite and en-suite bathroom above. For homeowners on corner plots or with wide side driveways, two-storey side extensions are popular, offering utility rooms, integrated garage conversions, or home offices downstairs, complemented by additional children's bedrooms or guest suites upstairs. We also design and build complex wraparound extensions that join side and rear footprints for transformative whole-house expansions. Whether modifying a traditional 1950s semi-detached home or extending a modern detached property, our builds are designed to enhance day-to-day functionality and add lasting property value.
Read the full Double Storey Extensions guide for design options, planning rules and what drives cost.
Living in the house while we work
Many homeowners in Selston choose to live in their property while we construct their two-storey extension. Because a double storey build proceeds externally during the initial groundwork, brickwork, and roofing stages, your daily home life remains largely unaffected for the first several weeks. Daily living is most impacted when we knock through from the existing house into the new space on both floors. To manage this, we construct timber-framed, dust-sealed temporary partition walls that isolate living quarters from the work zone. We schedule structural openings, lintel insertions, and major plumbing or electrical switchovers systematically to keep your heating, power, and water running with minimal interruptions. Logistics are handled carefully on site: Selston properties often allow for vehicle parking and skip placement on private driveways, but where space is tighter, we arrange road permits or immediate grab-lorry removals. We establish clear working hours, keep common access paths safe and swept, and maintain open communication with your neighbours throughout the build.
Areas we also cover near Selston
From our central base near Nottingham, our construction teams regularly deliver double storey extensions across Selston and all neighbouring communities within the Ashfield district. We frequently manage home extension projects in Underwood, where semi-rural plots often provide scope for substantial rear and side extensions. We also work across Jacksdale, transforming older terraced properties and modern detached family houses through carefully planned structural additions. In Kirkby-in-Ashfield, we regularly design and construct multi-storey extensions across established suburban avenues and newer housing estates. Because we operate across this entire pocket of Nottinghamshire, our team understands local planning dynamics, soil conditions, and vernacular architectural styles throughout all nearby postcodes.
Double Storey Extensions in Selston: questions people ask
What are the primary cost drivers for a double storey extension in Selston?
The overall cost of a double storey extension in Selston depends heavily on total footprint, site gradient, and the complexity of ground conditions. Older ex-mining plots often require engineered strip or raft foundations. Upstairs layout adjustments, bathroom additions, structural steel spans over knock-through kitchens, and roof configuration (matching existing hip or gable profiles) also drive expenditure. Final internal finishes, glazing choices like bi-fold doors, and upgrading your current central heating capacity all influence the ultimate budget.
What is an indicative budget guide for a double storey build here?
For a standard double storey extension in Selston, indicative costs generally sit between £1,600 and £2,300 per square metre for a complete shell and internal finish, excluding premium fixtures. A compact two-storey rear addition of around thirty square metres across both levels usually serves as an entry baseline, while larger wraparound builds cost more. These figures represent an indicative guide rather than a fixed quote, which requires an on-site survey of your specific property.
How long does a double storey extension take from start to finish?
On-site construction for a double storey extension in Selston typically takes between 12 and 18 weeks, depending on scale, ground conditions, and weather. The initial four weeks focus on groundwork, drainage diversion, and concrete footings. Brickwork up to first-floor level, floor joists, and roof structure usually take another five weeks. Internal first fix, plastering, plumbing, electrical installations, knocking through, and structural second fix complete the final four to seven weeks of work.
Will I need planning permission from Ashfield District Council?
Planning permission from Ashfield District Council is required if your proposed two-storey addition falls outside Permitted Development limits. This applies if the extension extends beyond three metres at the rear, sits closer than two metres to a side boundary with eaves over three metres, or exceeds your existing roof ridge height. We prepare all architectural drawings, elevations, and submission documents, managing the full eight-week determination period with Ashfield's planning department on your behalf.
Can a two-storey extension be built under Permitted Development in Selston?
Some double storey rear extensions can be built under Permitted Development in Selston without a full planning application, provided they meet strict statutory criteria. The extension must be at the rear of the original house, extend no more than three metres back, match the existing exterior materials, maintain a seven-metre distance from the rear boundary, and avoid upper-floor side windows unless obscure-glazed and non-opening below 1.7 metres. We review your deeds and Permitted Development allowances before designing.
How do conservation or local heritage rules affect two-storey additions?
If your property is situated within a designated Conservation Area in Selston or carries a statutory listing, your Permitted Development rights for two-storey additions are restricted or removed entirely. Ashfield District Council enforces stricter controls over roof pitches, window styles, brickwork matching, and overall massing to protect local heritage. In these situations, we submit a detailed full planning application accompanied by a design and heritage impact statement tailored to satisfy local planning policies.
Who handles building regulations and site inspections in Selston?
All double storey extensions require full Building Regulations approval to ensure structural integrity, thermal efficiency, fire safety, and proper ventilation. In Selston, building control is delivered by Erewash Borough Council through the Erewash and West Nottinghamshire building consultancy. Building control inspectors visit the site at key milestones, including footing excavations, damp proof course installation, structural steel installations, roof insulation checks, and the final inspection before issuing your formal Completion Certificate.
Do I need a Party Wall agreement with my neighbours in Selston?
Under the Party Wall etc. Act 1996, you must serve formal notice to your neighbours if your extension involves excavating foundations within three or six metres of their structure, or if you build directly against or astride a shared boundary. In Selston's semi-detached and terraced avenues, this is common. We help you identify affected boundaries early, draft compliant party wall notices, and work with appointed surveyors if your neighbours request an official award.
How do VAT and stage payments work for residential extensions?
Double storey home extensions on residential properties are subject to standard VAT at 20 percent. To provide clarity and budget security, our stage payments are agreed before construction begins and detailed within a transparent contract. Payments are phased across demonstrable build stages: completion of foundations, wall plate brickwork, roof weathertightness, first fix trades, plastering, and final handover. We never request full upfront payments, ensuring you pay only for completed, inspected work.
Are architectural drawings and structural calculations included?
Every double storey extension requires architectural plans, construction drawings, and structural calculations prepared by a qualified structural engineer. Calculations define padstone dimensions, steel beam specifications for open-plan knock-throughs, and foundation designs suitable for local ground conditions. We provide a complete design-and-build service, handling full drafting, engineering calculations, and statutory submissions so your extension is fully compliant before our groundworkers cut the first trench.
How should I choose a reliable builder for a double storey extension?
Selecting the right builder for a double storey project requires verifying insurance cover, checking experience with complex two-storey knock-throughs, and ensuring they manage building control approvals properly. You should always request a clear, itemised scope of work and a phased payment schedule linked to real inspection stages. As a local design and build contractor, we provide single-point accountability from initial survey and structural design right through to the final building control sign-off.
Can we stay in our home while the double storey extension is built?
Most homeowners in Selston remain in their property throughout a double storey extension. During the first two months, works remain outside while we build the external shell, roof, and first-floor structure. Disruption increases during the knock-through phase when structural openings are cut into existing walls. We install sealed dust partitions, maintain temporary kitchen or heating services where possible, and schedule messy structural work during agreed daytime working hours to minimise everyday inconvenience.
How are parking, deliveries, and skip placements managed on site?
Access and logistics depend on your property layout. Many Selston properties feature private driveways or generous side paths that simplify materials delivery and skip placement. Where side access is tight or parking is restricted, we arrange licensed road skips and schedule grab lorries for rapid muck-away. We maintain tidy sites, sweep shared roadways daily, and communicate with immediate neighbours to prevent driveway blockages or parking friction during delivery days.
What guarantees, warranties, and completion paperwork will I receive?
Upon practical completion, you receive a full handover pack containing your Building Regulations Completion Certificate from the Erewash and West Nottinghamshire building consultancy. This pack also includes electrical installation certificates (Part P), gas safety commissioning documents for boiler adjustments or new radiators, and our structural build warranty. Retaining these documents is crucial, as solicitors require them whenever you decide to remortgage or sell your home in the future.
Do you build double storey extensions in areas near Selston?
Yes, from our base near Nottingham we build double storey extensions across the entire Ashfield district and surrounding communities. Alongside Selston, we regularly work on domestic extensions and structural alterations in Underwood, Jacksdale, and Kirkby-in-Ashfield. Our local presence means we understand regional ground characteristics, typical brick profiles, and the specific planning requirements of Ashfield District Council across all nearby villages and residential developments.
How do I get started with a double storey extension in Selston?
Getting started is straightforward. Contact us by phone on 07888 885791, send a quick message via WhatsApp, or submit your property details using the quote form on this page. We will discuss your spatial requirements, review any existing ideas or drawings, evaluate the planning history of your property, and arrange a free, no-obligation on-site consultation to provide an honest assessment and an indicative project budget.
Next step for your Selston project
If you are considering a double storey extension in Selston to expand your ground-floor living area and add valuable first-floor bedrooms, we are ready to assist. Contact Design N Build today to arrange an initial feasibility discussion. Call our team directly on 07888 885791, message us through WhatsApp for a prompt reply, or complete the short quote form on this page with details of your property. We will review your ideas, explain the relevant planning requirements with Ashfield District Council, and arrange a no-obligation home visit to give you an accurate, transparent assessment of what is possible for your home.